Submit Your Article  |  Article Feeds  |  Contact Us  |  Home


Do you have an article to share?
Submit Your Article for Free
 
auto and trucks
business and finance
computers and internet
electronics
entertainment
family and home
food and drink
health and diet
home improvement
kids and teens
legal
marketing
online business
parenting
recreation and sports
self improvement
site promotion
travel and leisure
web design and hosting
women
writing

Your Link Here

Computers and Internet Articles


Shijiazhuang completed the overall removal of 27 polluting enterprises


dress

5 held on the morning of the city of Shijiazhuang City Environment Conservation and land resources management meeting. Reporter learned from, in order to ensure that the public enjoy blue sky, stone city this year will be starting up "blue sky 2010" action, focus on implementation of the "city of the net wash day" and "clean water" project, to ensure good air quality, urban environment and stability of days in 317 days. Which cut the main city of 2 million tons of coal consumption, 27 key polluting enterprises as a whole to move new projects divert rain and sewage drainage.

Good days stabilized at more than 317 days At yesterday's meeting, the Shijiazhuang municipal government issued the "blue sky 2010 Action Plan." Under the program, will be implemented this year, Stone City, "City net wash day" and "clean water" project, to ensure the city's 2010 total emissions of the chemical oxygen demand based on the 2005 reduction of 18%, control at 117,300 tons less; total sulfur dioxide emissions in 2005 based on the reduction of 15.5%, control less than 176,500 tons. Reduced use of coal the main city of 2 million tons, the number of days of urban air quality excellent stability in 317 days or more, the three major annual average pollutant concentrations meet the national standards.

The end of 2010, Hutuo,: India Yin Ze Ou Shan? ground rice cockroach file group incite tour of a metal cap core pull Ha? OD concentration of less than 130mg / L. Non-rainy season to ensure the absolute magnetic River, the main fast section of the City in COD concentration of less than 100mg / L, Shijin main channel to reach class standard; Municipal Wastewater Treatment Rate 90%, of which urban Sewage Processing rate of 100%; Kong South Reservoir, the main water reservoir Huangbizhuang indicators remain stable at the national surface water quality standard , urban centralized drinking water source to the main water quality compliance rate of 96%.

27 overall relocation of polluting enterprises 2010 years "City net wash day" project, Stone City will adjust the Energy Structure, improve Central heating Rate of burning is prohibited in urban areas and Sell More than 0.8% sulfur coal.

Increase the quality of low-sulfur coal promotion efforts, the city promote the use of high-quality low sulfur coal 6,000,000 tons. Speed up the heat and the heating pipe network construction, speed up the deer Chinese power plant, good village power plant project, by the District Government, the New District Administrative Committee is responsible for mandatory removal of heat supply network and gas pipeline network coverage area of scattered coal-fired Boiler . Completed 27 key polluting enterprises in the urban relocation task.

Strengthen health cleaning, so that trunk roads (including the elevated road, non-motor vehicle lanes) mechanical cleaning and watering every day more than 3 times, washed 1 time every 10 days; station, Car Station Square and other major cities in the node and the Second Ring Road, the city population of 500 meters per 10-day extension 1 scour; rain washed dirt road in a timely manner; time sweeping down the lane.

Divert rain and sewage drainage New Project "Clean water" project, aimed at the problem of insufficient capacity of sewage treatment plants, stone city requirements to ensure that Qiaodong Sewage Treatment Works was the end of March 2010 before the realization of full load operation, and meet the national emission standards for B; upgrade project was adopted before the end of September 2010 inspection.

To ensure that sewage treatment plant west of Phase 3 expansion project at the end of 2010, put into operation before the end of May and put into formal operation by acceptance; by the end sewage treatment plant west of the update project and acceptance. Speed up the Luancheng, Zhao County Sewage Treatment Plant Phase II and good sewage treatment plant south of the village the first phase of construction and to be completed before the end of 2010 and through acceptance.

Municipal planning departments, new projects must be rain and sewage drainage diversion design, and municipal drainage pipe connected to the front lines, inspection shall be well, or not to approve the procedures; Municipal Urban Management Bureau and the county (city) City drainage management to strengthen supervision to ensure the new drainage project construction activities by planning and design requirements.

About The Author

I am China Quality Dress writer, reports some information about telechips , syson bluetooth gps.



Latest Computers & Internet Articles


Submit an Article  |  Article Feeds  |  Contact Us  |  Home  |  Site Map